Macro
Shandong Qingdao modern water network construction plan released
Seetao 2023-07-28 09:57
  • The modern water network construction plan plans to implement 311 key projects with a total investment of 143.6 billion yuan
  • Among them, it plans to invest 43.45 billion yuan before 2025, 76.47 billion yuan from 2026 to 2035, and 23.68 billion yuan after 2035
Reading this article requires
10 Minute

Water conservancy is related to the national economy and people's livelihood, and is related to the most basic livelihood of the people. On July 27, 2023, Qingdao Water Administration Bureau held a press conference and announced the "Qingdao Modern Water Network Construction Plan". The main content of the planning can be summarized in four sentences: aiming at three major positioning in vision, building three major layout in space, improving four capabilities in function, and building six major networks in system. In order to ensure and support the implementation of the plan, 311 key projects with a total investment of 143.6 billion yuan are planned to be implemented, including the promotion of Guanlu Reservoir and water transmission and distribution projects, the implementation of the lower reaches of the Dagu River, the control of flood control and drainage of the Xiaogu River, the comprehensive management of the ecological environment of the Li Cun River (Zhang Cun River) basin, and the management of 20 small and medium-sized rivers.

According to reports, the "Qingdao modern water network construction Plan" aims to comprehensively improve the ability of water security, connect with the national and provincial water networks, and connect with Qingdao's territorial spatial planning. Centering on the creation of six cities, it plans to build a modern water network with complete system, safe and reliable, intensive and efficient, green and intelligent, smooth circulation and orderly regulation, and systematically proposes an overall solution to the problem of new and old water. Draw a new blueprint for Qingdao's water development in the next 15-30 years.

First of all, Qingdao aims to create a municipal demonstration zone of modern water network in Shandong Province, by 2025, Shandong Province should basically complete the construction of the national provincial water network pilot zone, Qingdao as the province's leading city, will increase the implementation of planning, and actively create a municipal demonstration zone of modern water network in Shandong province. Secondly, it aims to build the Qilu model pilot area for rural revitalization of water conservancy protection. Finally, it aims to build an important practice area of water beauty industry and water living economy.

According to the three vision positioning, the overall goal of the plan is: By 2035, the flood prevention and disaster reduction network, water supply security network, urban and rural drainage network has been fully completed, flood and drought disaster prevention capacity has been comprehensively improved, and the capacity of water resources allocation and urban and rural water supply security has been significantly enhanced. The river and lake ecological network, water cultural landscape network, and smart water water network have been basically completed, and the river and lake ecological protection and management capacity has been significantly improved, and the intelligent level of the water network has been further improved, and the water beauty industry has effectively promoted high-quality economic and social development.

In order to ensure and support the implementation of the plan, 311 key projects with a total investment of 143.6 billion yuan are planned to be implemented, including the promotion of Guanlu Reservoir and water transmission and distribution projects, the implementation of the lower reaches of the Dagu River, the control of flood control and drainage of the Xiaogu River, the comprehensive management of the ecological environment of the Li Cun River (Zhang Cun River) basin, and the management of 20 small and medium-sized rivers. Among them, it plans to invest 43.45 billion yuan before 2025, 76.47 billion yuan from 2026 to 2035, and 23.68 billion yuan after 2035. Through the construction of the large water network, the water is stored, the water is moved, and the water economy is realized and the people's livelihood is moisten. Key words: infrastructure, infrastructure construction, domestic engineering news, planning investment

The plan also clarified safeguard measures from four aspects, including strengthening organizational leadership, deepening preliminary work, increasing capital investment, and improving scientific and technological leadership, proposed specific reform measures to promote comprehensive water price reform, water rights distribution and trading, and formulated the "Qingdao Modern Water Network Construction Action Plan (2023-2025)" to clarify the annual implementation plan of the project. Editor/Xu Shengpeng


Comment

Related articles

Macro

Solar manufacturing is booming in India

10-16

Macro

France 2023 solar PV installed capacity hit a new high

10-16

Macro

Mining goes overseas, Gabon starts gold mining development journey with China

08-19

Macro

Sign! China can build the first foreign aid project in Central Asia

07-19

Macro

Canada ushered in a number of energy storage projects

07-19

Macro

Egypt signs $33 billion green ammonia deal with energy giant

07-05

Collect
Comment
Share

Retrieve password

Get verification code
Sure