On July 26, 2023, the construction of Yongxiu Phase II, Yugan, Qianshan and Shicheng household distributed photovoltaic projects of Longyuan Power Jiangxi Company was officially started, with a total capacity of 180 MW.
The project is respectively located in Yongxiu County, Jiujiang City, Shangrao City, Yugan County, Shangrao City, and Shicheng County, Ganzhou City, Jiangxi Province. The total installed capacity is 180 megawatts. The "full online" mode is adopted for consumption. 5010 housing roofs are used to build distributed photovoltaic power stations. A total of 327273 550 peak watt monocrystalline silicon solar modules are installed in the four projects. The project utilizes photovoltaic module brackets, bottom anchor bolts, and roof connections, arranged in a fixed inclination angle manner.
After the completion of the project, it is expected that the average annual power generation will be 188.064 million kilowatt hours. Based on the consumption of 305 grams of coal per kilowatt hour of thermal power (standard coal), 572400 tons of standard coal can be saved annually, reducing carbon dioxide emissions by about 150000 tons, sulfur dioxide emissions by about 486 tons, and nitrogen oxide emissions by about 424.8 tons. This has good social, environmental, and economic benefits, and plays a positive demonstration role in environmental protection and air pollution prevention in the local area, It has a good promoting effect on promoting the construction of a clean, low-carbon, safe and efficient energy system and optimizing the energy structure in local areas. Editor/Zhao E
Comment
Write something~