Construction Frontline
Zhongyuan Construction Engineering signed a new Saudi bridge project
Seetao 2023-09-12 08:37
  • After the completion of the project, it will be used to connect the road traffic of the scenic spots on both sides of Wadi Road
  • The project provides convenient commuting conditions for local residents' daily life
Reading this article requires
2 Minute

The total amount of the project is 101 million yuan, and the owner unit is Saudi al-Khail Municipal Government

The main construction project consists of two parallel Bridges, connecting roads and ancillary facilities such as electricity. The length of the main bridge is 613.54 meters, the width of the bridge is 17.65 meters, a total of 16 spans, 176 pieces of prefabricated T-beams, 220 pile foundations. The construction period is 360 days.

The construction site is at the intersection of King Abdullah Road and King Saud Road in Hail, Saudi Arabia.

After the completion of the project, it will be used to connect the road traffic of the scenic spots on both sides of Wadi Road, providing convenient commuting conditions for the lives of local residents, and at the same time, the project will be a landscape bridge project, adding a new highlight for the city government of Haile to build a new local tourist city. Editor/GaoLiMei



Comment

Related articles

Construction Frontline

Kazakhstan Heromtau Wind Power Project

09-09

Construction Frontline

Damak Golf Green No.1 Project

09-06

Construction Frontline

Major projects of China Africa cooperation from a space perspective

09-04

Construction Frontline

CFHEC signs contract for Mbale Water Supply Section 2 project

09-03

Construction Frontline

460 million water conservancy project falls to China Railway

08-29

Construction Frontline

Goldwind Technology Brazil wind power equipment manufacturing base put into operation

08-29

Collect
Comment
Share

Retrieve password

Get verification code
Sure