Business promotion
120 million yuan! BEIXIN Road and Bridge Group wins new bid for highway project
Seetao 2023-09-21 09:43
  • The successful bid for this project is the result of BEIXIN Road and Bridge’s deep market penetration.
  • It is also a practical recognition of the capabilities of the International Engineering Division by the Second Division Transportation Bureau, the owner of the project currently under construction
Reading this article requires
6 Minute

Recently, good news came from the BEIXIN Road and Bridge International Engineering Division. On September 12, the Second Division Transportation Bureau received the "Notice of Winning the Bid" for the Second Division G0711-21 Regiment-26 Regiment Highway Project (Second Contract Section).

It is reported that the winning bid price of the project is 120,803,031.94 yuan and the construction period is 730 calendar days. The starting point of the route of this project is located at the exit of the 21st Group Interchange Toll Station of the G0711 (Urumqi-Yuli Expressway) under construction. It passes through the 21st Group, crosses the Kaidu River, passes through the 22nd Group, and crosses the Southern Xinjiang Railway (Tuku First Line), G218, and Huangshui Gouhe passes through the 24th Regiment, goes down to the Nanjiang Railway (Tukuu Second Line), crosses the G3012, passes through the 26th Regiment, Quhui Town, and ends at K332+680 of the G314 Line. The construction pile numbers of this section are K13+500~K37+500, and the road length is 24km. Among them, K13+500~K18+647 is constructed according to the two-way four-lane first-class highway standard, with a design speed of 80km/h and a roadbed width of 22.5m; K18+647 ~K37+500 is constructed according to the two-way two-lane secondary highway standard, with a design speed of 80km/h and a roadbed width of 12m. The construction content includes routes, roadbeds, pavements, drainage, protection, 80 culverts, and 4 bridges (Junken Bridge, Nanjiang Bridge, etc.) Railway G218 overpass bridge, Kailai Third Bridge, Kailai First Bridge), 7 grade road level crossings, safety facilities, other projects, etc.

The successful bid for this project is the result of BEIXIN Road and Bridge International Engineering Division's deep market penetration based on projects under construction. It is also a practical recognition of the capabilities of the International Engineering Division by the Transportation Bureau of the Second Division, the owner of the project under construction. The International Engineering Division will continue to create high-quality projects to serve the local people, consciously implement the general requirements of thematic education, anchor on major issues such as "market development, project management, output value and revenue, and safety production", explore the most useful information, and make the most optimal choices Make decisions and take the most effective measures to lead the employees to cut through the waves and start a new journey. Editor/Xu Shengpeng


Comment

Related articles

Business promotion

bauma CHINA 2024 | Attention grabbing new products, wonderful debut

11-28

Business promotion

The First Aviation Administration held a rectification and promotion meeting

11-26

Business promotion

China Xidian won the title of "2024 Shaanxi Province Quality Benchmark Enterprise"

11-26

Business promotion

The Third Congress of China Huadian Corporation was successfully held

11-26

Business promotion

Danfoss showcases decarbonization solutions and partners at CIIE

11-18

Business promotion

Shantui Mining Products Assist in Efficient Mining of Nalun Coal Mine in Kyrgyzstan

11-13

Collect
Comment
Share

Retrieve password

Get verification code
Sure