On November 23rd, the second phase of the Lianyungang Hongyang cogeneration expansion project (original site) was officially signed with three main engines, marking a further improvement of Hongyang Thermal Power in expanding its heating business and enhancing its heating development pattern. Leaders from Hongyang Thermal Power Co., Ltd., China Energy Construction Group Jiangsu Electric Power Design Institute Co., Ltd., Shanghai Turbine Factory Co., Ltd., Dongfang Boiler Co., Ltd. of Dongfang Electric Group, and Shandong Jinan Power Equipment Factory Co., Ltd. attended the signing ceremony.
The signing ceremony provided a detailed introduction to the operation mode, industrial layout, and strategic planning of Hongyang Thermal Power, and multiple parties discussed the follow-up cooperation matters of the second phase project. The cooperation between Hongyang Thermal Power and Jiangsu Electric Power Design Institute has a long history and runs through the development process of both parties. The signing of this contract with Dongfang Boiler Plant, Shanghai Steam Turbine Plant, and Jinan Power Generation Equipment Plant is a "new cooperation" reached by "old friends", continuing to write a new chapter of collaborative development. The signing of this second phase project has brought the cooperation of multiple parties to a new starting point and a new level, jointly promoting the high-quality and efficient completion and production of the second phase project, and helping Hongyang Thermal Power's green and low-carbon transformation.Editor/XuNing
Comment
Write something~