The third road from Yuli to Qiemo Desert, which crosses the Taklimakan Desert in the world's desert, was fully resumed in recent days. The highway from Yuli to Qiemo Desert is a secondary road with a total length of 333.784 kilometers.
It is reported that the starting point of this desert highway from Weili to Qimo is located in Talimu Township, Yuli County, 15 kilometers away from Yuli County. After the road crosses the Taklimakan Desert, it is connected to the currently under construction Ruoqiang-Minfeng Highway near Qimo County. The total length of the highway is about 333 kilometers, of which the desert section is about 304 kilometers.
According to reports, the project will be completed and opened to traffic in 2021. At that time, the distance to Korla will be shortened by 280 kilometers, and the driving time will be shortened from more than 12 hours to 6 hours. Editor / Huang Lijun
On April 25, a large bulldozer pushed a sand hill about 70 meters high
On April 25, large bulldozers are under construction
On April 25th, several workers were planting grass to check the sand and protect the road
Comment
Write something~