One day, 24 hours from domestic to overseas, from northern to southern Xinjiang, witness the fast from dawn to dusk, take the exclusive route of China Nengjian No. 1 Electric Company, and let's enjoy the unique charm of the project site!
First stop: Inner Mongolia
In the early morning, with a daybreak of sunshine, the day of the victory project department of Dongdian No. 1 Company was officially opened.
Construction site of Inner Mongolia Jingkeke Youzhong Thermal Power Plant project of Dongdian No. 1 Company
At the construction site of the first phase of the wind power construction of Beiligutai, Huaneng Abaga Banner, Dongdian No. 1 Company, a tower was hoisted in the sunset
Second stop: Jilin
The construction site of Huaneng Jilin Nong'an Biomass Power Plant Phase II Expansion Project suddenly experienced heavy snowfall, and the construction personnel positioned the anchor bolts of the boiler against the wind and snow
Third stop: Liaoning
At 5:40, the Hongyanhe Nuclear Power Plant ushered in a brand new day in the morning glow
At 9:09, the high-pressure shaft box bearing of turbine No. 6 was installed
At 14:35, Ye Yu, the construction worker of the steam turbine site, was measuring the gap between the two sides of the high-pressure cylinder partition.
At 15:57, the LP2 low-pressure inner cylinder of Unit 6 was lifting
At 16:34, the LP2 low-pressure inner cylinder of Unit 6 was safely and accurately seated
At 21:35, the construction crew cleaned the lower half of the inner cylinder of Unit 6 LP1
Fourth station: Hebei
The maintenance personnel of Dongdian No. 1 Company carried out the task of replacing the graphite packing of the coal mill
Fifth Station: Henan
The construction site of the Puyang Wind Power Project of Dongdian No. 1 Company is in the process of hoisting the tower of the T section of the No. 139 wind turbine.
Nanyang Power Plant under construction
Sixth stop: Shandong
The six-person lifting team of the boiler site of the Luxi Project Department of Dongdian No. 1 Company, led by the technician on duty Yang Gengquan and the team leader Fan Jinhong, started the midnight boiler lifting work
Seventh stop: Jiangsu
Jiangyin Gas Turbine Power Plant No. 1 main building is 5.5 meters high. Workers are carrying out steam turbine rotor coupling alignment and steam turbine-generator coupling rotor lifting work
Eighth stop: Shaanxi
At midnight, the temporary water pump on the boiler system of Unit 5 suddenly failed, and the Jinjie Project Department of Dongdian No. 1 Company urgently dispatched relevant professional and technical personnel for consultation
Ninth Station: Guangdong
In the conventional island plant, the maintenance personnel of the Taishan Nuclear Power Maintenance Project Department of Dongdian No. 1 Company are performing relevant work in accordance with the regulations.
Tenth stop: Xinjiang
In the 8-meter steam room of the main plant, a construction worker is directing the crane to lift the hook.
Eleventh stop: Bangladesh
A full picture of the Payala Power Plant in Bangladesh.
Aerial view of the scene of the second phase of SUMMIT Margaret in Bangladesh.
At the site of the third phase of the UNIQUE Margaret project in Gala, a one-week test pile sinking is in progress.
The 225MW combined cycle power plant of the second and third phases of Shilagange Bangladesh constructed by Tepco I is under a two-year warranty and maintenance period
Twelfth stop: Iraq
Early in the morning, the Iraqi Salah Al-Din Power Station on the northern bank of the Tigris River started a new day.
Thirteenth stop: Philippines
At the construction site of the Philippines cyber letter project, Chinese and Philippine employees form a special construction team.
The maintenance and repair personnel of Mesames Power Station in the Philippines, Dongdian No. 1 Company, assisted the owners to complete various equipment maintenance and repair tasks, and was called the most beautiful mask brother by the owners.
Philippine Conconcepson Power Plant in the sunset. The operation and maintenance project of the Philippine Concepson Circulating Fluidized Bed Coal-fired Power Plant undertaken by TEPCO has entered its fifth year.
China Energy Construction has always adhered to the concept of innovation and created unlimited value for China's engineering construction. The 24-hour global engineering image recording activity is a brand-new attempt of a series of brand cultural activities and a brand-new reform of the entire project construction. Editor / Duan Wenyan