Recently, the on-site promotion meeting of the Chongqing-Chinan-Shuyong Expressway from Banan, Chongqing to Chiyong, Sichuan, was held in Chishui City. It conducted in-depth exchanges on the technical standards, construction methods, and investment attraction of the expressway.
It is reported that the total planned mileage of the Yuchixu Expressway is about 194 kilometers, with an estimated total investment of 21.8 billion yuan. The expressway starts in Banan, Chongqing, passes through Jiangjin in Chongqing, Hejiang in Sichuan, and Chishui in Guizhou, and ends at Tianchi Town in Xuyong, Sichuan, of which 66 km are in Chongqing, 65 km are in Sichuan, and 63 km are in Guizhou. At present, the Chongqing section of the Yuchixu Expressway has basically completed the feasibility study of the project, and plans to conduct an industry review in the near future. The Sichuan section has completed the study of land and space planning, and basically determined the wiring plan with the Chongqing section. The Guizhou section completed the plan research work, basically confirmed the route corridor, initially planned to pass through the long-term Chishui territory, Tiandao Lake, Wanglong and Rongzun Expressway crossing, along the north side of the Chishui River through Bing'an, the south side of Chishui City, Datong and Sichuan The routes are connected.
After the completion of the Yuchixu Expressway, it will become an important new channel through Sichuan, Chongqing and Guizhou. In the future, it will accelerate the optimization and complementation of regional resources, promote the leap-forward development of surrounding areas, and will also ease the existing traffic pressure. To facilitate the travel of people in the area. Editor/He Yuting
Comment
Write something~