On December 24, 2020, China Railway Third Bureau won the bid for the new Jinhua-Jiande Railway JJGTSG I bid section project, which is located in Jinhua City in the southwest of Zhejiang Province and Jiande City in Hangzhou. The line is drawn from the Jinhua Station of the existing Shanghai-Kunming Railway, passing through Lanxi and Jiande City in the north, and connected to the existing Jiande East Station by the outsourced Hangzhou-Huangzhou Railway. The newly-built line is 64.508 kilometers long. The length of the Jinhua-Dongxiao section of the existing Shanghai-Kunming Railway is 11.928 kilometers in total.
There are 4 stations on the whole line: Jinhua, Lanxidong, Dayang, and Jiandedong, among which Jinhua Station and Jiande East Station are junction stations. Build a new Jinhua parking yard with 6 parking lanes. Jinhua-Dongxiao reconstruction project, the main project in front of the station, the track laying project of the whole line, the beam-making and erecting (including the waterproof layer of the bridge deck and the bridge deck and the cable-stayed bridge of the low-tower cable-stayed bridge (in the direction of small mileage) of the Jinhua Beam Factory, Jinhua Station and Lanjiang Bridge Expansion joints) and the corresponding bridge deck system engineering, part of the post-station engineering that needs to be implemented. Editor/Xing Wentao
Comment
Write something~