Recently, Power China’s success has been reported frequently and several overseas projects have been signed one after another!
1. Multiple projects in Indonesia and Iran landed
In the first month of 2021, Shanghai Equipment's feedwater pump equipment was launched in a number of overseas projects in Indonesia and Iran, and successively won the bids of Indonesia's Anjia, Indonesia's Hamahela and Iran's Danieli projects and achieved a good start.
The Indonesian Anjia and Hamahela projects will construct 2×380 MW thermal power boiler feedwater pumping equipment in this phase. The project site is located in the central region of North Maluku Province in eastern Indonesia. The Danieli project will construct the 450MW ISO combined cycle project waste heat boiler electric feedwater pump equipment in this phase.
The winning project adopted HPT200-330 model and Q series segmental pump respectively. Shanghai Equipment Company continued to refine and change the plan, focusing on the advantages of HPT200-300 model products. This model is a domestic model independently developed by our company, with a large market share, safe and reliable, and more in line with the operation and maintenance of most manufacturers in various situations.
2021 is the beginning year of the 14th Five-Year Plan. Shanghai Equipment Company will work hard to set the goal of the start and start the China Power Construction brand with better services.
2. Guinea Sigiri Substation Project
A few days ago, the Third Hydropower Bureau successfully signed the Guinea Sigiri substation project. This is after the signing of the Guinea Fumi substation, it has added more performance to the company's power transmission and transformation field in Guinea, and achieved a good start for the international market in 2021.
The 225/30 kV substation in Sigir, Guinea is located in Sigir City, Kangkang Region, Guinea. The project owner is the Ministry of Energy of Guinea. The construction period is 18 months. The project contract mode is EPC general contracting. Like the Fumi Substation, this project is also part of the 225kV main transmission and transformation grid in Guinea.
PowerChina has always adhered to high standards for performance. Since its establishment, it has successfully built a number of influential and landmark infrastructure projects. In the future, PowerChina will strive to create value and give back to the society. Editor/Sang Xiaomei
Comment
Write something~