On January 25, 2021, the China Railway Construction Chongqing Investment Group Consortium won the bid for the PPP project of the Ring Expressway Project in Rongchang District, Chongqing, with a total investment of about 2.8 billion yuan
Construction scale
The starting point of the project’s route is located at Pingshang Village on the west side of Qingsheng Town, connecting Tongrong Expressway, and the end point is at Emei Village on the east side of Fenggao Street, connecting G85 Chengyu Expressway. Route direction: The route starts from Pingshang Village on the west side of Qingsheng Town in Rongchang and connects to Tongrong Expressway, and connects to Emei Village on the south side of Qingsheng Town, north side of Shuanghe Street, south side of Zhisheng Town, and east side of Yufenggao Street. G85 Chengyu Expressway. The peak-to-height hub is interconnected, with a total length of 23.61 kilometers, 0 tunnels, and 12.45% of bridges. The entire line adopts the design speed of 100 kilometers/hour, the roadbed width of 26 meters, and the two-way 4-lane expressway standard construction.
The construction period is the concession period, which is divided into construction period and operation period. Among them, the construction period: 3 years, from the project start date to the completion date; the operation period from the completion date to the project handover date, of which the charging period is 30 years.Editor/Xing Wentao
Comment
Write something~