There is good news from Malawi countries. Recently, the Ninth Hydropower Bureau won the bid for the Shire Valley Reconstruction Project, the largest livelihood project in Malawi, marking that the Ninth Hydropower Bureau has opened up a new country market and placed another place in the African market.
People's Livelihood Project
About half of the population of Malawi lives in the Shire River Basin. The project is located in the lower valley of the Shire River. The reconstruction of the lower valley is the largest livelihood project in Malawi in recent years. The project has a construction period of 36 months. The main construction content includes the No. 1 and No. 2 trunk canal and pipeline water supply projects. The No. 1 trunk canal is 26.8 kilometers long, the No. 2 trunk canal is 18 kilometers long, and the cross section of the trunk canal is an inverted trapezoidal structure. After the project is completed, it will benefit tens of thousands of families and provide them with basic living security. At the same time, it will effectively solve the problem of water shortage in the southern region and facilitate the transformation of Malawi's agriculture from small-scale farming to commercial agriculture.
The Shire River is 402 kilometers long and is the only drainage channel of Lake Malawi, the third largest freshwater lake in Africa. At present, Malawi's infrastructure is relatively backward. With the process of urbanization, its urban drinking water is also beginning to face shortages.
Hydropower Ninth Bureau
In recent years, the Ninth Hydropower Bureau has actively explored new markets through regional marketing and joint marketing, relying on projects under construction, and the market has continued to expand. At present, the overseas epidemic situation is complex and changeable. The first-line marketers of the Ninth Hydropower Bureau are doing a good job in normalizing the prevention and control of the epidemic, and at the same time changing their work methods to ensure that the business is not reduced and the work is continuous to ensure that the annual goals and tasks are continuously filed and not slack. .
The international staff of the Ninth Bureau of Hydropower is going against the current, sticking to the front line, taking responsibility, and acting actively. Party members play a pioneering role and stand up. Under the premise of good protection, they will take multiple measures to develop overseas market business and promote the high quality of the group's international business. Develop and promote the construction of the Belt and Road with practical achievements. Editor/Tian Zengpeng
Comment
Write something~