On the morning of April 22, 2021, Pingdingshan City will hold a concentrated start of key projects in the second quarter. Zhou Bin, Secretary of the Pingdingshan Municipal Party Committee, Zhang Leiming, Mayor, and Ge Qiaohong, Deputy Secretary of the Municipal Party Committee, visited the construction site of the Yanshan Reservoir Water Diversion Project in Nylon City, China.
China Nylon City Yanshan Reservoir Water Diversion Project has a total investment of 1.19 billion yuan. The designed water supply line has a total length of 44.6 kilometers. It starts from the left bank of Yanshan Reservoir. It uses pressure pipelines to divert water and flows through Baoan Town, Yeyi Town, Tianzhuang Township, etc. 7 townships (towns, streets), stop at the China Nylon City Water Plant. After the project is completed, it can provide industrial water for the Yexian Industrial Cluster and China Nylon City, provide agricultural irrigation water for tens of thousands of acres of arable land along the project, and lay a water source foundation for the implementation of surface water replacement of groundwater for safe drinking water in Yexian rural areas. The Li River, Hui River and other water systems are connected to optimize the allocation of water resources in Ye County. It can also provide ecological water for rivers, lakes, ponds, etc. along the route, and promote the construction of beautiful villages, which has very significant economic and ecological benefits.
Based on a new stage
This time, Pingdingshan City has started a total of 207 projects with a total investment of 104.14 billion yuan and an annual investment target of 37.18 billion yuan, covering industrial transformation, infrastructure, ecological and environmental protection, social undertakings, innovation-driven and many other fields, of which industrial transformation development projects are the most , Up to 134, with a total investment of 65.29 billion yuan. The construction of this batch of projects is a concrete action taken by Pingdingshan City to gain a foothold in the new development stage, implement new development concepts, and integrate into the new development pattern. It is a major measure to promote industrial transformation and upgrading, conversion of new and old kinetic energy, and improvement of development quality. The task is of great significance to ensure that the "14th Five-Year Plan" has a good start and a good start. Editor/XuNing
Comment
Write something~