In the first year of the 14th Five-Year Plan, various provinces have issued construction plans for the 14th Five-Year Plan. The reporter of Jiandao.com learned on May 19 that the General Office of the Zhejiang Provincial Government issued the “Fourteenth Five-Year Plan for Major Construction Projects in Zhejiang Province”, which clearly stated During the "14th Five-Year Plan" period, 245 major construction projects were arranged, with a total investment of 8263.7 billion yuan. Among them, the planned investment in water conservancy projects is 144.2 billion yuan.
Implementation of Zhejiang water network projects such as Haitang Anlan 100 billion, reservoir energy increase and security, plain high-speed waterway, major river embankments, optimized allocation of water resources, Xingfu River and lakes, etc., to build a high-standard flood control and security network, a high-level water source configuration network, and a high-quality Xingfu River Lake network, high-performance smart water conservancy network. Arranged for 17 major construction projects, with an investment of 144.2 billion yuan in the "14th Five-Year Plan".
Among them, the construction and expansion of high-speed waterways in the coastal plains such as the southern row of Hangzhou-Jiasco-Hunan, the implementation of the extension and dredging of the river in the center of Jiaxing, the follow-up of the improvement of the Tiaoxi clear water into the lake, the drainage of the plain of the south wing of Hangzhou Bay, the expansion of the north row of Yuyao, and the west division of the upper reaches of the Yaojiang River.
Promote the construction of the three major water resources allocation channels in North Zhejiang, East Zhejiang, and Middle Zhejiang, implement water source projects such as Jingling Reservoir, and water diversion projects such as Wenzhou Oujiang River, Lishui Tankeng, Jiaxing Taihu Lake, Zhoushan Shengsi Mainland, and Huzhou Anji Reservoir. Editor/Xu Shengpeng
Comment
Write something~