Investment
China Energy Construction Pakistan DASU Hydropower Station RAR-02 Road Started
Seetao 2021-05-28 09:14
  • It can effectively improve the local infrastructure conditions and improve the quality of life of the people
Reading this article requires
3 Minute

On May 25, 2021, the Pakistan DASU Hydropower Project RAR-02 road project undertaken by China Energy Construction Gezhouba III Company started.

The DASU hydropower station is located in the Indus River Basin, Koshistan District, Khyber Pakhtunkhwa Province, Pakistan. The total installed capacity of the power station is 5,400 MW. It will be implemented in two phases. The first phase installed 6 units, totaling 2,160 MW. The dam is 242 meters high and 570 meters long, with a designed RCC project volume of 4.7 million cubic meters. It is the world's highest RCC dam under construction and one of the most technically difficult, largest total installed capacity, and largest hydropower projects in Pakistan. . The RAR-02 road is about 42 kilometers long. After the project is completed, it can effectively improve the local infrastructure conditions and bring great convenience to local people.

Keywords: One Belt One Road, engineering construction, overseas engineering

In the next step, China Energy Construction Gezhouba III will strictly control the epidemic, give full play to the professional advantages of hydropower road construction, create high-quality projects for the people of Pakistan, and make great contributions to the economic development of countries along the Belt and Road. Editor/Tian Zengpeng

Comment

Related articles

Investment

Private enterprises continue to play a stabilizing role in foreign trade

10-16

Investment

Nandu Power signs India energy storage system procurement contract

10-16

Investment

China Shipbuilding Middle East Representative Office unveiling ceremony

10-14

Investment

Huadian Haitou's first new energy project landed in Southeast Europe

10-11

Investment

Middle East and North Africa company unveiled its plaque

10-10

Investment

CNBM establishes China Africa Green Building Materials Joint Laboratory

10-08

Collect
Comment
Share

Retrieve password

Get verification code
Sure