Transportation
9.5 billion! Qinyang-Yichuan Expressway won the bid result!
Seetao 2021-06-08 11:35
  • The project adopts two-way four-lane highway technical standards, with a design speed of 100 km/h and a roadbed width of 26 meters
Reading this article requires
7 Minute

On June 7, 2021, Luoyang Public Resources Trading Center issued the announcement of Luoyang Transportation Bureau’s Qinyang-Yichuan Expressway investor winning bid, led by Henan Transportation Development Group Co., Ltd., Beijing Municipal Road and Bridge Co., Ltd., China Communications The consortium consisting of the Second Navigation Engineering Bureau Co., Ltd., China Communications Road and Bridge Construction Co., Ltd., Poly Changda Engineering Co., Ltd., China Communications Third Highway Engineering Co., Ltd., and China Communications First Highway Survey, Design and Research Institute Co., Ltd. won the bid and won the bid. The amount is 9.5 billion yuan.

Qinyang-Yichuan Expressway

The construction site of the project is located at the starting point of the Qinyang-Yichuan Expressway at the north of Dazhao Village in Qinyang City and the Hebao Expressway, and the end point is at the junction of Baisha Town, Yichuan County and Ruyang County, connected to the Xinyi Expressway, the connecting line of Jianer-Guangzhou Expressway , The total length of the route is about 98 kilometers. It mainly passes through Jiaozuo City, Gongyi City and Luoyang.

The length of the route is about 98 kilometers, of which the length of Luoyang City is about 57.2 kilometers, and the length of Zhengzhou (Gongyi) City is about 14.5 kilometers. Adopting two-way four-lane expressway technical standards with a design speed of 100 km/h and a roadbed width of 26 meters; the Yellow River Super Bridge adopts two-way six-lane expressway technical standards with a design speed of 120 km/h and roadbed width of 34.5 meters. Projects include, but are not limited to, main line projects and toll stations, service areas, management centers, monitoring centers, maintenance centers and other related ancillary facilities. The construction period is planned to start construction in September 2021, and it will be completed and opened to traffic in September 2025, with a construction period of 48 months. The estimated investment in the border projects of Luoyang and Zhengzhou is about 9.5 billion yuan.

Keywords: engineering news, engineering construction, construction news, engineering construction, municipal projects

After winning the bid, the investor shall set up a project company in accordance with the "Company Law of the People's Republic of China" and other relevant laws and policies, and the project company shall conduct the whole process of project planning, fund raising, construction implementation, operation management, debt repayment and asset management. Responsible, operate independently, and be responsible for its own profits and losses, and after the expiration of the franchise period stipulated in the franchise agreement, the road (including land use rights), road ancillary facilities and related materials shall be handed over to the industry competent department free of charge in accordance with the provisions of the franchise agreement. Editor/Sang Xiaomei, Design/Xia Changwang

Comment

Related articles

Transportation

Road Construction holds 2024 New Quality Development Technology Seminar

11-26

Transportation

Shanghai Zhoudeng Expressway officially starts construction

10-15

Transportation

The terminal building of Dalian New Airport has started construction!

10-14

Transportation

70 billion yuan intercity railway project is coming!

10-14

Transportation

Seymour is about to build a road

10-12

Transportation

The Kazakhstan Mongolia highway connection is about to be launched

10-12

Collect
Comment
Share

Retrieve password

Get verification code
Sure