Municipal
Chengdu Wenjiang's first TOD project officially started
Seetao 2021-07-20 17:52
  • This time, a total of 8 projects in Wenjiang, Chengdu, were started, with a total investment of about 15.3 billion yuan
Reading this article requires
4 Minute

On July 20, 2021, construction of major projects in the third quarter of Chengdu Wenjiang Health Service Industry Cluster will be started. It is understood that the projects started this time include Chengdu Xuhui Center, Fantasia·Wanghuaxi Phase II, Jingrui Yaqing and other 8 major projects, with a total investment of about 15.3 billion yuan, covering commercial services, culture, high-end residential, public Services and many other fields.

Wenjiang TOD Project

Among them, the Chengdu Xuhui Center project is the first project in Wenjiang District to implement comprehensive development based on the public transportation-oriented development model (TOD). The total land area is about 282 mu, and the planned total construction area is 730,000 square meters (including 110,000 square meters). Mi commercial shopping center, 147,000 square meters of characteristic commercial blocks, offices, etc.). The planned total investment is about 10 billion yuan. It is planned to build a "one-stop" urban life circle project featuring a park city.

At present, Wenjiang District of Chengdu is advancing the construction of "Five Cities" in depth, making every effort to build a park city demonstration pilot area that implements the new development concept. In 2021, it will lead the implementation of 42 major social investment projects with an annual planned investment of 12.45 billion yuan. In the first half of 2021, 7.452 billion yuan will be invested. The concentrated start of construction is also a major measure for the implementation of the "Ten Major Projects for Happy and Beautiful Life" in the Chengdu Wenjiang Health Service Industry Cluster, which will further improve the living standards of Wenjiang residents after completion. Editor/He Yuting

Comment

Related articles

Municipal

Nanchang AMEC GaAs-based LED MOCVD equipment project was signed

09-11

Municipal

From northern Shaanxi to Guanzhong, the 750 kV channel started

09-02

Municipal

CRCC Port and Shipping Bureau Self elevating Wind Power Installation Platform Crane

08-30

Municipal

Paris Region launches metro accessibility renovation project

08-29

Municipal

Jiangsu Heavy Machinery Intelligent Manufacturing Base Project Launched

08-11

Municipal

Elizabeth Project's Second Shore Bridge Completed in the United States

07-31

Collect
Comment
Share

Retrieve password

Get verification code
Sure